Checklist

BMS architecture checklist for early design review.

Before PCB layout, confirm that the concept covers sensing, switching, protection, telemetry and validation.

BMS architecture checklist with PCB and cells

Must have

AFE, current sensing, thermal sensing, switching and mechanical cell control.

Power packs

Add fuse, contactor and precharge where current and load energy justify it.

Review output

Document voltage window, BMS current, runtime, thermal points and unresolved risks.